We’re back this week with Laura Pfister, Senior Sales Associate, and Andy Yoder, Field Services Engineer to talk about electrical considerations for site prep in advance of instrument installation.
Electrical Quick Checklist:
- Main power is installed and in compliance with local electrical codes.
- Power outlets are of the correct configuration, and enough outlets are available.
- Voltage of power outlet has been measured. Power is free from fluctuations due to slow changes in the average voltage or changes due to surges, sags or transients.
Stay tuned for Site Prep – part 3 (Benchspace) next week.